Eaton Authorized Partner — UPS, PDU & Power Continuity

CITADEL Power — Physical Infrastructure

Eaton Authorized Partner — UPS, PDU & Power Continuity

Eaton Authorized Partner across UPS, PDU, generator interface, and battery maintenance — designed alongside the cabling, fire, access, and video that share the same closet. Power continuity is engineered into the converged CITADEL stack, not bolted onto the side by a fourth vendor.

Eaton
Authorized Partner
9PX–93PR
Full Eaton UPS Lineup
NFPA 70/99/110
Codes We Build To
1
SLA Across the Whole Closet
The Problem With Most Power Projects

Power, cabling, access, and cameras share the same closet — most integrators treat each as a separate project

Walk into any commercial telecom closet and look at it: UPS at the bottom, network gear in the middle, fire panel on the wall, access controllers above the network, cameras feeding into an NVR, and cabling running everywhere. Five different vendors put it together over five different project cycles. The closet works — but barely — and the next person who has to add a circuit or replace a battery has to reverse-engineer four other vendors’ decisions first.

CITADEL Power is engineered against the same low-voltage plan that drives CITADEL Connect, Gate, Fire, and Watch. Eaton UPS sized to the load it actually carries. PDU engineering coordinated with the rack plan. Battery maintenance documented and on a real cadence. Power events feeding into the same event fabric that handles security, fire, and notification.

Armorstack is a true integrator, not a reseller and not a branded front-end. The design engineer, the installer, the service technician, and the customer success contact all sit inside the same shop.

Capabilities & Credentials

What We Design, Install & Maintain

Eaton Authorized Partner

Confirmed Eaton Authorized Partner relationship — full design, sell, install, and commission authority across the Eaton UPS, PDU, and power-distribution portfolio.

UPS Sizing & Commissioning

Load-profile-driven sizing, not product-preference-driven. We size to runtime requirement, redundancy plan, and growth profile, then commission to Eaton spec with operations-team training included.

PDU Engineering

Rack and floor-standing PDU design, branch-circuit metering, and integration with rack environmental monitoring.

Generator Interface

Automatic transfer switch, generator control wiring, and generator-status integration into the UPS and broader monitoring layer, coordinated with the electrical contractor.

Battery Maintenance

Battery test, replacement, and lifecycle programs aligned to manufacturer recommendation and client operations risk — documented, not skipped.

Monitoring Integration

UPS, PDU, and ATS status feed the same event fabric that handles fire, access, and intrusion. Power events become operations events automatically.

Scope of Service

  • Eaton UPS design and install — 9PX, 9SX, 5P, 5PX for IT and edge; 93PM and 93PR for data center.
  • UPS sizing — load profile, runtime requirement, redundancy plan, and growth.
  • PDU engineering — rack and floor-standing, branch-circuit metering.
  • Generator interface — ATS, control wiring, generator-status integration.
  • Battery maintenance program — test, replacement, lifecycle.
  • Healthcare UPS — imaging, pharmacy, and clinical-area essential power.
  • Data center UPS — Eaton 93PM and 93PR for medium-to-large deployments.
  • Power monitoring integration — UPS, PDU, and ATS status into the broader CITADEL event fabric.

Every engagement is custom-scoped. UPS sizing is load-profile driven. Site assessment first, written line-item quote second — no packages, no published pricing.

Where CITADEL Power Shows Up

Healthcare

Hospital UPS for imaging, pharmacy, and clinical areas. NFPA 99 and NFPA 110 coordination with the essential-power plan. Battery maintenance is non-negotiable in healthcare, and we run programs that document it.

Data Center & Enterprise IT

Eaton 93PM and 93PR for medium-to-large white-space deployments. PDU engineering coordinated with TIA-942 cabling and rack plan.

Manufacturing & OT

Plant UPS for control systems, server rooms, and edge compute. Generator interface for production-critical loads, coordinated with OT/IT separation in CITADEL Gate access design.

Multi-Site Retail

Store-level UPS for POS continuity, network gear, and security infrastructure. Portfolio-wide standards instead of one-off-per-store decisions.

One Closet, One Contract

CITADEL Power Is One Piece of a Converged Stack

CITADEL Power works alongside the other CITADEL services and Armorstack’s broader Managed Intelligence Provider portfolios. Most clients start with one and converge over time. Armorstack is a true integrator — we own the design, the install, the service, and the customer relationship.

SENTRY

UPS and PDU telemetry feed the SOC. Battery health, transfer-switch operation, and utility quality become security signals — power problems are often the first sign of a broader incident.

CORE

UPS, PDU, and generator interface run on the same network we engineer with CITADEL Connect. Power and cabling share the same closet, the same pathway plan, the same grounding philosophy.

VERITY

vCIO advisory maps power continuity against IT roadmap, building lifecycle, and disaster-recovery plan. Capital decisions on UPS replacement get made against the broader DR strategy, not in isolation.

CITADEL Watch

Power events route to the same 24/7 monitoring center that handles intrusion and fire signals. Utility loss in the middle of the night becomes a monitored event with operations-team escalation, not a surprise the next morning.

Standards We Build To

Every UPS, PDU, and ATS installation is engineered against the codes that govern it — not just the manufacturer’s install guide.

NFPA 70 (NEC)NFPA 99NFPA 110UL 1778TIA-942IEEE 1100 (Emerald Book)

NFPA 70 (NEC) governs UPS, PDU, and ATS installation. NFPA 99 covers hospital essential power; NFPA 110 covers emergency and standby power systems. UL 1778 is the UPS equipment standard, TIA-942 is the data center power infrastructure standard, and IEEE 1100 governs powering and grounding for sensitive electronic equipment.

What We’re Doing Right Now

Active Eaton UPS deployments across healthcare, multi-site retail, and enterprise IT environments. Battery maintenance programs running on existing client UPS plant.

Generator interface and ATS integration work coordinated with electrical contractors on new construction and major renovation projects.

Direct references available under NDA on a qualified-prospect basis. Eaton partner status is verifiable through Eaton’s authorized partner registry.

Frequently Asked Questions

Are you an Eaton partner?
Yes. Armorstack is an Eaton Authorized Partner. Authorized status means we can design, sell, install, and commission Eaton UPS, PDU, and power-distribution equipment with full Eaton support. Our partner-tier growth is internal, and this page’s language stays “Eaton Authorized Partner” until that changes.
What Eaton lines do you install?
Across the Eaton portfolio — 9PX, 9SX, 5P, and 5PX for IT and edge applications; 93PM and 93PR for data center and large-facility applications; PDU and ATS lines for power distribution and transfer; and rack and floor-standing form factors. We size to load profile, not to product preference.
Do you handle generators?
We handle generator interface — automatic transfer switches, control wiring, and integration of generator status into the UPS and monitoring layer. Generator equipment itself is typically supplied by the electrical contractor or generator vendor; CITADEL Power integrates the generator into the broader power-continuity plan.
Can you do battery maintenance programs?
Yes. Battery maintenance is one of the most-skipped scopes in the industry, which is why so many UPS systems fail when the utility drops. CITADEL Power runs battery test, replacement, and lifecycle programs aligned to the manufacturer’s recommended cadence and the operations risk tolerance of the client.
Do you do healthcare UPS?
Yes. Hospital UPS for imaging, pharmacy, and clinical areas — coordinated with the broader essential-power and standby-power plan. NFPA 99 and NFPA 110 considerations factor into the design, and the integration with CITADEL Watch keeps power events visible to operations in real time.
Can you do data center UPS?
Yes. Eaton 93PM and 93PR for medium-to-large data center deployments — coordinated with TIA-942 cabling layout (CITADEL Connect), facility cooling plan, and power monitoring through CITADEL Watch.
How does power tie into your monitoring stack?
UPS, PDU, and ATS status feed the same event fabric that handles fire, access, intrusion, and notification. Power events — utility loss, battery depletion, transfer-switch operation — surface in the same portal as security events. Operations doesn’t have to context-switch.
How do I get pricing?
Every CITADEL Power engagement is custom-scoped. Eaton sizing is load-profile driven, and the scope depends on rack count, runtime requirement, and integration depth. Site assessment first, written line-item quote second.

Get a Scoped Quote.

Tell us the load profile, the runtime requirement, and the integration depth. We schedule a site assessment, size the UPS, and return a written line-item quote.

Armorstack is an Eaton Authorized Partner delivering UPS, PDU, and power-continuity engineering as part of the converged CITADEL physical security stack. One team. One SLA.